Core drilling
Constructing a properly sized sub-slab extraction pit to establish effective soil gas communication for the radon mitigation system.
Suction pit
The suction pit was strategically positioned adjacent to the sump pump basin to enhance sub-slab communication and maximize pressure field extension.
